Documentation Services for Engineering Teams

3DWerk delivers drawings, BIM models, and technical reports for AEC teams — built around your standards, integrated into your workflows, and off your plate.

Ways to Work Together

Start where it makes sense. Scale when it does.

Every engagement begins with a clearly defined scope and ends with review-ready deliverables. Where you start depends on your project — where you go depends on your decision.

Pilot Task

One task. Fixed scope. No commitment. The fastest way to see what structured documentation delivery looks and feels like inside your own project — before deciding anything further.

Project Support

Continuous documentation capacity embedded directly in your active project. Drawings, models, and reports produced in parallel with your engineering team — so production stops being a bottleneck and your engineers stay focused on decisions.

Project Package

Coordinated delivery across multiple tasks, phases, and deliverables — structured as a single, coherent output from the start. For teams ready to treat documentation as a system, not a series of individual tasks.

Extended Deliverables

Optional additions — visualisations, 4D animations, sustainability analytics, enhanced BIM data — layered onto any engagement without changing the core delivery setup.

Project Support

Documentation running in parallel. Continuously.

Project support is designed for active projects that need stable, ongoing documentation capacity. Drawings, models, and reports are produced continuously alongside your engineering team — using your established standards, interfaces, and coordination routines. The result is not just outputs, but a predictable production rhythm that your team can rely on throughout the project.

Project Package

Documentation as a coordinated system. Not a collection of tasks.

A project package covers a broader, clearly defined scope where 2D drawings, 3D models, and technical reports are delivered as a coordinated whole — connected by shared parameters, consistent formatting, and defined handover logic. This is documentation delivery at its most structured. Outputs are predictable, versioned, and coherent across every deliverable and phase.

Start with a

Pilot Task

Leave your email and we will get in touch to discuss a suitable pilot documentation task and next steps.

By clicking submit you agree to our Privacy Policy and have taken note of the Legal Terms.
Received. We'll be in touch shortly.
Something didn't work. Please try again or email us directly at info@3dwrk.com